Due to environmental protection and limited resource utilization at optimum level, remanufacturing of defective products or reused products is an essential strategy in green supply chain inventory control system. This paper presents a green supply chain inventory model for integrated production of new items and remanufacturing of redeemable returned items under a situation in which the vendor provides the buyer with a permissible delay of payments and supplies the serviceable items to the buyer on lot-for-lot basis. It is assumed that every member of the chain is ready to collaborate for the maximum benefit of the supply chain. A mathematical formulation is developed to derive the optimal number of deliveries and the replenishment cycle time for the integrated vendor-buyer inventory model. Theoretical results show the global optimality of the solution and it is concluded that the collaboration is profitable for the chain and participating members reach the optimal level under co-operative decision making. Numerical analysis is given to illustrate the theoretical results. Finally, a sensitivity analysis is reported to study the effect of various parameters.
Accepté le :
DOI : 10.1051/ro/2016077
Mots-clés : Production, remanufacturing, trade credit, lot- splitting delivery policy
@article{RO_2017__51_4_1133_0, author = {Saxena, Neha and Singh, Shiv Raj and Sana, Shib Sankar}, title = {A green supply chain model of vendor and buyer for remanufacturing}, journal = {RAIRO - Operations Research - Recherche Op\'erationnelle}, pages = {1133--1150}, publisher = {EDP-Sciences}, volume = {51}, number = {4}, year = {2017}, doi = {10.1051/ro/2016077}, mrnumber = {3783938}, zbl = {1400.90012}, language = {en}, url = {http://www.numdam.org/articles/10.1051/ro/2016077/} }
TY - JOUR AU - Saxena, Neha AU - Singh, Shiv Raj AU - Sana, Shib Sankar TI - A green supply chain model of vendor and buyer for remanufacturing JO - RAIRO - Operations Research - Recherche Opérationnelle PY - 2017 SP - 1133 EP - 1150 VL - 51 IS - 4 PB - EDP-Sciences UR - http://www.numdam.org/articles/10.1051/ro/2016077/ DO - 10.1051/ro/2016077 LA - en ID - RO_2017__51_4_1133_0 ER -
%0 Journal Article %A Saxena, Neha %A Singh, Shiv Raj %A Sana, Shib Sankar %T A green supply chain model of vendor and buyer for remanufacturing %J RAIRO - Operations Research - Recherche Opérationnelle %D 2017 %P 1133-1150 %V 51 %N 4 %I EDP-Sciences %U http://www.numdam.org/articles/10.1051/ro/2016077/ %R 10.1051/ro/2016077 %G en %F RO_2017__51_4_1133_0
Saxena, Neha; Singh, Shiv Raj; Sana, Shib Sankar. A green supply chain model of vendor and buyer for remanufacturing. RAIRO - Operations Research - Recherche Opérationnelle, Tome 51 (2017) no. 4, pp. 1133-1150. doi : 10.1051/ro/2016077. http://www.numdam.org/articles/10.1051/ro/2016077/
A joint economic-lot-size model for purchaser and vendor. Decis. Sci. 17 (1986) 292–311. | DOI
,J.T. Retailer’s economic order quantity when the supplier offers conditionally permissible delay in payments link to order quantity. Inter. J. Prod. Econ. 155 (2014) 284–291. | DOI
, and ,Short life-cycle deteriorating product remanufacturing in a green supply chain inventory control system. Inter. J. Prod. Econ. 129 (2011) 195–203. | DOI
and ,The simplified solution procedure for deteriorating items under stock-dependent demand and two-level trade credit in the supply chain management. Appl. Math. Model. 37 (2013) 4653–4660. | DOI | MR | Zbl
and ,R. Dekker, M. Fleischmann and K. Inderfurth, Reverse logistics: quantitative models for closed-loop supply chains. Springer Verlag, Heidelberg (2004).
An integrated inventory model for a single supplier-single customer problem. Inter. J. Prod. Res. 15 (1976) 107–111. | DOI
,Economic order quantity under conditions of permissible delay in payments. J. Oper. Res. Soc. 36 (1985) 335–338. | DOI | Zbl
,An integrated inventory model under conditions of order processing cost reduction and permissible delay in payments. Appl. Math. Model. 34 (2010) 1352–1359. | DOI | MR | Zbl
,An inventory control problem for deteriorating items with back-ordering and financial considerations under two levels of trade credit linked to order quantity. J. Ind. Manag. Optimiz. 12 (2016) 1091–1119. | DOI | MR | Zbl
, and ,An inventory model with time dependent demand and shortages under trade credit policy. Econ. Model. 35 (2013) 349–355. | DOI
, and ,Lot-streaming policy for forward–reverse logistics with recovery capacity investment. Inter. J. Adv. Manufacturing Techn. 68 (2013) 509–522. | DOI
, and ,A comprehensive extension of an integrated inventory model with ordering cost reduction and permissible delay in payments. Appl. Math. Model. 37 (2013) 4709–4716. | DOI | MR | Zbl
and ,A deterministic model for a repairable item inventory system with a finite repair rate. Inter. J. Prod. Res. 17 (1979) 215–221. | DOI
and ,Optimal strategy for an integrated system with variable production rate when the freight rate and trade credit are both linked to the order quantity. Int. J. Prod. Econ. 115 (2008) 151–162. | DOI
, and ,Two-echelon competitive integrated supply chain model with price and credit period dependent demand. Int. J. Syst. Sci. 47 (2016) 995–1007. | DOI | MR | Zbl
, and ,S. Panda, Optimal pricing replenishment policy in a declining price sensitive environment under continuous unit cost decrease. Inter. J. Math. Oper. Res. (2011) 431–450. | MR | Zbl
Coordination of a socially responsible supply chain using revenue sharing contract. Trans. Res. Part E: Log. Trans. 67 (2014) 92–104. | DOI
,Pure and mixed strategies for the EOQ repair and waste disposal problem. OR Spectrum 19 (1997) 123–129. | DOI | MR | Zbl
,Analysis of the EOQ repair and waste disposal model with integer setup numbers. Inter. J. Prod. Econ. 59 (1999) 463–467. | DOI
, and ,A deterministic EOQ model with delays in payments and price-discount offers. Eur. J. Oper. Res. 184 (2008) 509–533 | DOI | MR | Zbl
and ,Supply chain coordination with variable backorder, inspections, and discount policy for fixed lifetime products. Math. Probl. Eng. 2016 (2016) 6318737. | DOI | MR | Zbl
,An inventory model with trade-credit policy and variable deterioration for fixed lifetime products. Ann. Oper. Res. 229 (2015) 677–702. | DOI | MR | Zbl
, and ,An integrated inventory model with variable lead time, defective units and delay in payments. Appl. Math. Comput. 237 (2014) 650–658. | MR | Zbl
, , and ,A production-inventory model with probabilistic deterioration in two-echelon supply chain management. Appl. Math. Model. 37 (2013) 3138–3151. | DOI | MR | Zbl
,An EOQ model with delay in payments and time varying deterioration rate. Math. Comput. Model. 55 (2012) 367–377. | DOI | MR | Zbl
,An EOQ model with delay in payments and stock dependent demand in the presence of imperfect production. Appl. Math. Comput. 218 (2012) 8295–8308. | MR | Zbl
,A deterministic Inventory model for repairable items. Nav. Res. Log. Quarterly 14 (1967) 391–398. | DOI
,S.R. Singh, L. Prasher and N. Saxena, A centralized reverse channel structure with flexible manufacturing under the stock out situation. Inter. J. Industrial Eng. Comput. 42013 559–570.
An optimal returned policy for a reverse logistics inventory model with backorders. Adv. Decis. Sci. 2012 (2012) 386598. | MR | Zbl
and ,A closed loop supply chain system with flexible manufacturing and reverse logistics operation under shortages for deteriorating items. Procedia Technol. 10 (2013) 330–339. | DOI
and ,S.R. Singh and N. Saxena, An integrated inventory model with remanufacturing of secondary material under shortages. Proc. of 3rd International Conference on Recent Trends in Engineering & Technology (2014) 354–359.
Green supply-chain management: a state-of-the-art literature review. Inter. J. Manag. Rev. 9 (2007) 53–80. | DOI
,Collaboration for a closed-loop deteriorating inventory supply chain with multi-retailer and price-sensitive demand. Int. J. Prod. Econ. 143 (2013) 557–566. | DOI
, , , and ,Cité par Sources :