@article{RO_2000__34_2_131_0, author = {Guinand, Fr\'ed\'eric and Trystman, Denis}, title = {Scheduling {UET} trees with communication delays on two processors}, journal = {RAIRO - Operations Research - Recherche Op\'erationnelle}, pages = {131--144}, publisher = {EDP-Sciences}, volume = {34}, number = {2}, year = {2000}, mrnumber = {1755979}, zbl = {0961.90032}, language = {en}, url = {http://www.numdam.org/item/RO_2000__34_2_131_0/} }
TY - JOUR AU - Guinand, Frédéric AU - Trystman, Denis TI - Scheduling UET trees with communication delays on two processors JO - RAIRO - Operations Research - Recherche Opérationnelle PY - 2000 SP - 131 EP - 144 VL - 34 IS - 2 PB - EDP-Sciences UR - http://www.numdam.org/item/RO_2000__34_2_131_0/ LA - en ID - RO_2000__34_2_131_0 ER -
%0 Journal Article %A Guinand, Frédéric %A Trystman, Denis %T Scheduling UET trees with communication delays on two processors %J RAIRO - Operations Research - Recherche Opérationnelle %D 2000 %P 131-144 %V 34 %N 2 %I EDP-Sciences %U http://www.numdam.org/item/RO_2000__34_2_131_0/ %G en %F RO_2000__34_2_131_0
Guinand, Frédéric; Trystman, Denis. Scheduling UET trees with communication delays on two processors. RAIRO - Operations Research - Recherche Opérationnelle, Tome 34 (2000) no. 2, pp. 131-144. http://www.numdam.org/item/RO_2000__34_2_131_0/
[Chr89] A Polynomial Algorithm to Optimally Schedule Tasks on a Virtual Distributed System Under Tree-like Precedence Constraints. European J. Oper. Res. 43 (1989) 225-230. | MR | Zbl
,[DL88] Scheduling tree-structured tasks with restricted execution times. Inform. Process. Lett. 28 (1988) 183-188. | MR | Zbl
and ,[DL89] Complexity of Scheduling Parallel Tasks Systems. SIAM J. Discrete Math. 2 (1989) 473-487. | MR | Zbl
and ,[GRT97] Worst-Case Analysis of Algorithms for Scheduling UECT Trees on m Processors. IEEE Trans. Parallel and Distributed Systems 8 (1997).
, and ,[GT93] Optimal Scheduling of UECT Trees on Two Processors. Technical Report Rapport APACHE n° 3. Laboratoire de Modélisation et de Calcul - IMAG, Grenoble (1993).
and ,[Hu61] Parallel Sequencing and Assembly Line Problems. Oper. Res. 9 (1961) 841-848. | MR
,[Law93] Scheduling Trees on Multiprocessors with Unit Communication Delays, Workshop on Models and Algorithms for Planning and Scheduling Problems. Villa Vigoni, Lake Como, Italy (1993).
,[LVV93] The Complexity of Scheduling Trees with Communication Delays. Lecture Notes in Comput. Sci. (ESA'93) 726 (1993) 284-294. | Zbl
, and ,[NLH81] Optimal Processor Scheduling of Tree Precedence Constrainted Tasks with Two Execution Times. Performance Evaluation 1 (1981) 320-330. | MR | Zbl
, and ,[Pic93] Étude des Problèmes d'Optimisation dans les Systèmes Distribués. Ph.D. Thesis, Paris VI, Paris - France ( 1993, in French.
,[PY90] Towards an architecture-independent analysis of parallel algorithms. SIAM J. Comput. 19 (1990) 322-328. | MR | Zbl
and ,[RS87] UET Scheduling with Unit Interprocessor Communication Delays. Discrete Appl Math 18 (1987) 55-71. | MR | Zbl
,[Vel93] A Linear Time Algorithm to Schedule Trees with Communication Delays Optimally on Two Machines, Technical Report RUU-CS-93-04. Department of computer science, Utrecht (1993).
,[VRKL96] Scheduling In and Out Forests in the Presence of Communication Delays. IEE Trans. Parallel and Distributed Systems 7 (1996).
, , and ,