@article{RO_1998__32_2_125_0, author = {Richard, P. and Proust, C.}, title = {Solving scheduling problems using {Petri} nets and constraint logic programming}, journal = {RAIRO - Operations Research - Recherche Op\'erationnelle}, pages = {125--143}, publisher = {EDP-Sciences}, volume = {32}, number = {2}, year = {1998}, mrnumber = {1628989}, language = {en}, url = {http://www.numdam.org/item/RO_1998__32_2_125_0/} }
TY - JOUR AU - Richard, P. AU - Proust, C. TI - Solving scheduling problems using Petri nets and constraint logic programming JO - RAIRO - Operations Research - Recherche Opérationnelle PY - 1998 SP - 125 EP - 143 VL - 32 IS - 2 PB - EDP-Sciences UR - http://www.numdam.org/item/RO_1998__32_2_125_0/ LA - en ID - RO_1998__32_2_125_0 ER -
%0 Journal Article %A Richard, P. %A Proust, C. %T Solving scheduling problems using Petri nets and constraint logic programming %J RAIRO - Operations Research - Recherche Opérationnelle %D 1998 %P 125-143 %V 32 %N 2 %I EDP-Sciences %U http://www.numdam.org/item/RO_1998__32_2_125_0/ %G en %F RO_1998__32_2_125_0
Richard, P.; Proust, C. Solving scheduling problems using Petri nets and constraint logic programming. RAIRO - Operations Research - Recherche Opérationnelle, Tome 32 (1998) no. 2, pp. 125-143. http://www.numdam.org/item/RO_1998__32_2_125_0/
Optimization + objectivity = opt out, European Journal of Operational Research, 1977, 1. | Zbl
,Extending CHIP in order to solve complex scheduling and placement problems, Mathematical and computer modelling, 1993, 17, (7), pp. 57-73.
and ,Introduction to sequencing and scheduling, John Wiley & Sons.
,Shop floor Control Systems - From design to implementation, 1991, Chapman & Hall.
, , , and ,Une caractérisation analytique des ordonnancements admissibles sous contraintes hétérogènes en flow-shop, RAIRO-APII, 1991, 25, pp. 87-102. | Zbl
, , et ,Sequences constraint solver based on P-Q-R trees, ILPS'94, New York, 1994, 14 p.
, and ,Problèmes d'ordonnancement (modélisation/complexité/algorithmes), Masson, collection Études et Recherche en Informatique, 1987. | MR
and ,Timed Pétri net Schedules, Advances on Petri nets, 1988, Springer Verlag. | MR | Zbl
and ,Problèmes d'ordonnancement en Flowshop: Réseaux de Petri et PLC, Rapport de Projet de Fin d'études de l'École d'Ingénieurs en Informatique pour l'Industrie (E31), Université de Tours, 1995, France.
, and ,Petri net based modelling and scheduling of flexible manufacturing system, IEEE International Conference on Robotics and Automation, 1994, pp. 513-520. | Zbl
, and ,Réseaux de Petri temporisés, thèse d'état, Paris VI, 1983.
,Ordonnancement basé sur les réseaux de Petri, Rapport de Recherche INRIA, 1993, n° 1960.
, and ,An introduction to Prolog III, Communications of the ACM, 1990, 33, (7), pp. 69-90. | Zbl
,Cosytec, 1993, CHIP V4, user manual, Cosytec.
Practice of Petri nets in manufacturing Systems, Chapman et Hall, 1993.
, , , and ,AMPL: A Modelling language for mathematical programming, The scientific Press, 1993. | Zbl
and ,Sequencing and scheduling: an introduction to the mathematics of the Job-Shop, Ellis Horwood, 1982. | MR | Zbl
,GOThA (Groupe d'Ordonnancement Théorique et Appliquée), Les problèmes d'ordonnancement, RAIRO-Operations Research, 1993, 27, (1), pp.77-150.
Performance evaluation of job-shop Systems using timed event graphs, IEEE Transactions on Automatic Control, 1989, 34, (1), pp. 3-9. | MR | Zbl
and ,IJPR, International Journal of Production Research, Special Artificial intelligence in manufacturing, 1988, 26, (5).
Analysis of the behavior of a manufacturing cell with cyclic feeding policies, IEEE-SMC, San Antonio, 1994, pp. 1683-1688.
and ,Optimal two- and three-stage production schedules with setup times included, Naval Research Logistic Quality, 1954, 1, (1), pp.61-68.
,Sequencing and Scheduling: algorithms and complexity, Report BS-R8909, Center for Mathematics and Computer Science, Amsterdam, The Netherlands, 1989.
, , and ,Scheduling flexible manufacturing Systems using petri nets, and heuristic search, IEEE transactions on robotics and automation, 1994, 10, (2), pp. 123-132.
and ,Programmation par contraintes et ordonnancement : historique et perspectives, Tutorial, 9e Congrès Reconnaissance des Formes et Intelligence Artificielle, Paris, France, 1994a.
,Implementation of resource constraints in Ilog Schedule: a library for the development of constraint-based scheduling Systems, Intelligent Systems Engineering, 1994b, 3, pp. 55-66.
,Characterization of feasible schedules for the flowshop problem: a decomposition approach, INRIA European Workshop on Integrated manufacturing Systems Engineering (IMSE'94), Grenoble, 1994, pp. 307-315.
, and ,Régime asymptotique des graphes d'événements temporises généralisés : application à un problème d'assemblage, RAIRO-APII, 1993, 27, (5), pp. 487-513. | Zbl
,Petri nets: Properties, Analysis and Applications, Proceedings of the IEEE, 1989, 77, (4), pp.541-580.
,Les réseaux de Petri pour la conception et la gestion des systèmes de production, Masson, Paris, 1994.
and ,Using Johnson's algorithm for solving flow-shop scheduling problems, Proceedings of the summer school on Scheduling Theory and its Application, INRIA, Bonnas, 1992.
,Analysis of asynchronous concurrent Systems by timed Petri nets, Ph. D. Thesis, MIT, Cambridge, Project MAC-TR 120, 1974.
,Resolution of scheduling problems by modelling with Petri nets and a transcription in CHIP, INRIA European Workshop on Integrated Manufacturing Systems Engineering (IMSE'94), Grenoble, 1994, pp. 317-323.
, and ,Scheduling based on Petri nets and a resolution with CHIP, 2e International Conference on Manufacturing Automation, Nancy, 1995a, pp. 135-140.
, and ,Solving scheduling problems using Petri nets and constraint logic programming, INRIA/IEEE International Symposium on Emerging Technologies and Factory Automation (ETFA'95), Paris, 1995b, 9 p.
, , and ,Ordonnancement d'atelier en temps réel d'Orabaid à Ordo, Proceedings, journées d'études Ordonnancement et entreprises: applications concrètes et outils pour le futur, CNRS/GdR Automatique/SED/GT3, Toulouse, 1994, pp. 213-253.
, and ,Algèbre moderne et théorie des graphes, vol. 2, Dunod.
,On the Srikar-Gosh MILP model for the N x M SDST flow-shop problem, International Journal of Production Research, 1990, 28, (10) pp. 1817-1830.
, ,Sequencing on two and three machines with setup, processing and removal times separated, International Journal of Production Research, 1983, 21, (5), pp. 723-732. | Zbl
, ,A high level Petri nets model of generalized dynamic job-shop, European Workshop on Integrated manufacturing Systems Engineering (IMSE'94), INRIA, Grenoble, 1994, pp. 273-280.
, , and ,Constraint satisfaction in logic programming, MIT press, 1989. | MR
,Extension de la PLC pour le traitement des contraintes sur les séquences, MSCEAFI'94, Rabat, 1994, pp. 285-294.
, and ,Parallel and sequential mutual exclusions for Petri net modelling of manufacturing Systems with shared resources, IEEE transactions on Robotics and Automation, 1991, 7, (4), pp.515-527.
and ,