A heuristic method for the estimation of the project duration in a stochastic network scheduling
RAIRO - Operations Research - Recherche Opérationnelle, Special Issue on Complexity and Industrial Systems, Tome 29 (1995) no. 3, pp. 285-298.
@article{RO_1995__29_3_285_0,
     author = {Garavelli, A. C. and Pontrandolfo, P.},
     title = {A heuristic method for the estimation of the project duration in a stochastic network scheduling},
     journal = {RAIRO - Operations Research - Recherche Op\'erationnelle},
     pages = {285--298},
     publisher = {EDP-Sciences},
     volume = {29},
     number = {3},
     year = {1995},
     zbl = {0848.90057},
     language = {en},
     url = {http://www.numdam.org/item/RO_1995__29_3_285_0/}
}
TY  - JOUR
AU  - Garavelli, A. C.
AU  - Pontrandolfo, P.
TI  - A heuristic method for the estimation of the project duration in a stochastic network scheduling
JO  - RAIRO - Operations Research - Recherche Opérationnelle
PY  - 1995
SP  - 285
EP  - 298
VL  - 29
IS  - 3
PB  - EDP-Sciences
UR  - http://www.numdam.org/item/RO_1995__29_3_285_0/
LA  - en
ID  - RO_1995__29_3_285_0
ER  - 
%0 Journal Article
%A Garavelli, A. C.
%A Pontrandolfo, P.
%T A heuristic method for the estimation of the project duration in a stochastic network scheduling
%J RAIRO - Operations Research - Recherche Opérationnelle
%D 1995
%P 285-298
%V 29
%N 3
%I EDP-Sciences
%U http://www.numdam.org/item/RO_1995__29_3_285_0/
%G en
%F RO_1995__29_3_285_0
Garavelli, A. C.; Pontrandolfo, P. A heuristic method for the estimation of the project duration in a stochastic network scheduling. RAIRO - Operations Research - Recherche Opérationnelle, Special Issue on Complexity and Industrial Systems, Tome 29 (1995) no. 3, pp. 285-298. http://www.numdam.org/item/RO_1995__29_3_285_0/

1. C.W. Hull, The Future of Megaprojects, International Public Works Review, 1991, Vol. 1, n° 4, pp. 12-24.

2. Kd Consultants, Construction. A challenge for the European Industry, Commission of the European Community, Directorate-General for Science, Research and Development, DGXII, 1991.

3. S. Cavallone, Auditing large plant engineering projects, International Journal of Project Management, 1987, Vol. 5, n° 1, pp. 39-43.

4. V. Albino, Memory effects and uncertainty in project planning, Proc. of the 11th World Congress on Project Management (INTERNET), Florence, Italy, 1992.

5. S. E. Elmaghraby, The estimation of some network parameters in the PERT model of activity networks: review and critique, in: Advances in project scheduling, R. SLOWINSKI and J. WEGLARZ eds., Elsevier, 1989. | MR

6. F. S. Hillier and G. J. Lieberman, Introduction to Operations Research, McGraw-Hill, New York, USA, 1990. | Zbl

7. G. A. Johnson and C. D. Schou, Expediting projects in PERT with stochastic time estimates. Project Management Journal, 1990, Vol. 21, n° 2, pp. 29-33.

8. J. Magott and K. Skudlarski, Estimating the mean completion time of PERT networks with exponentially distributed durations of activities, European Journal of Operational Research, 1993, Vol. 71, pp. 70-79. | Zbl

9. R. A. Toelle and J. Witherspoon, From managing the critical path to managing critical activities, Project Management Journal, 1990, Vol. 21, n° 4, pp. 33-37.

10. H. A. Simon, Reason in Human Affairs, Stanford University Press, Stanford, USA, 1983.

11. R. A. Kaimann, Coefficient of network complexity, Management Science, 1974. | Zbl

12. C. M. Marshall, Applied graph theory, John Wiley and Sons, NewYork, 1971. | Zbl

13. V. Albino, S. Cavallone and G. Mummolo, An uncertainty measure in PERT-type network by Shannon's Entropy, Proc. of the 8th World Congress on Project Management (INTERNET), Glasgow (Italy), 1988.