Un nouveau concept de dominance pour l'ordonnancement de travaux sur une machine
RAIRO - Operations Research - Recherche Opérationnelle, Tome 19 (1985) no. 1, pp. 15-26.
@article{RO_1985__19_1_15_0,
     author = {Erschler, J. and Fontan, G. and Merce, C.},
     title = {Un nouveau concept de dominance pour l'ordonnancement de travaux sur une machine},
     journal = {RAIRO - Operations Research - Recherche Op\'erationnelle},
     pages = {15--26},
     publisher = {EDP-Sciences},
     volume = {19},
     number = {1},
     year = {1985},
     mrnumber = {794636},
     zbl = {0568.90049},
     language = {fr},
     url = {http://www.numdam.org/item/RO_1985__19_1_15_0/}
}
TY  - JOUR
AU  - Erschler, J.
AU  - Fontan, G.
AU  - Merce, C.
TI  - Un nouveau concept de dominance pour l'ordonnancement de travaux sur une machine
JO  - RAIRO - Operations Research - Recherche Opérationnelle
PY  - 1985
SP  - 15
EP  - 26
VL  - 19
IS  - 1
PB  - EDP-Sciences
UR  - http://www.numdam.org/item/RO_1985__19_1_15_0/
LA  - fr
ID  - RO_1985__19_1_15_0
ER  - 
%0 Journal Article
%A Erschler, J.
%A Fontan, G.
%A Merce, C.
%T Un nouveau concept de dominance pour l'ordonnancement de travaux sur une machine
%J RAIRO - Operations Research - Recherche Opérationnelle
%D 1985
%P 15-26
%V 19
%N 1
%I EDP-Sciences
%U http://www.numdam.org/item/RO_1985__19_1_15_0/
%G fr
%F RO_1985__19_1_15_0
Erschler, J.; Fontan, G.; Merce, C. Un nouveau concept de dominance pour l'ordonnancement de travaux sur une machine. RAIRO - Operations Research - Recherche Opérationnelle, Tome 19 (1985) no. 1, pp. 15-26. http://www.numdam.org/item/RO_1985__19_1_15_0/

1. K. R. Baker, Sequencing and Scheduling, John Wiley, New York, 1974.

2. K. R. Baker et Z. Su, Sequencing with Due Dates and Early Start Times to Minimize Maximum Tardiness, Naval Res. Logist. Quart., vol. 21, 1974, p. 171-176. | MR | Zbl

3. P. Bratley, M. Florian et P. Robillard, On Sequencing with Earliest Starts and Due Dates with Application to Computing Bounds for the (n/m/G/Fmax) Problem, Naval Res. Logist. Quart., vol. 20, 1973, p. 57-67. | MR | Zbl

4. J. Carlier et P. Chrétienne, Un domaine très ouvert : les problèmes d'ordonnancement, R.A.I.R.O.-Rech. Op., vol. 16, n° 3, 1982, p. 175-217. | Numdam | Zbl

5. J. Carlier, The One-machine Sequencing Problem, European Journal of Operational Research, vol. 11, 1982, p. 42-47. | MR | Zbl

6. R. W. Conway, W. L. Maxwell et L. W. Miller, Theory of Scheduling, Addison-Wesley, New York, 1967. | MR | Zbl

7. J. Erschler, G. Fontan, C. Merce et F. Roubellat, A New Dominance Concept in Scheduling n Jobs on a Single Machine with Ready Times and Due Dates, Operations Res., vol. 31, n° 1, 1983. | Zbl

8. G. Fontan, Notion de dominance et son application à l étude de certains problèmes d'ordonnancement, Thèse de Doctorat ès-Sciences, 1980, Université de Toulouse.

9. B. J. Lageweg, J. K. Lenstra et A. H. G. Rinnoy Kan, Minimizing Maximum Lateness one One Machine : Computational Experience and Some Applications, Statistica Neerlandica, vol. 30, n° 1, 1976, p. 25-41. | MR | Zbl

10. J. K. Lenstra et A. H. G. Rinnoy Kan, Complexity of Machine Scheduling Problem, Ann. Discrete Math., vol. 1, 1977, p. 343, 362. | MR | Zbl

11. G. Mcmahon et M. Florian, On scheduling with Ready Times and Due Dates to Minimize Maximum Lateness, Operations Research, vol. 23, n° 3, 1975, p. 475-482. | Zbl

12. B. Roy, Algèbre moderne et théorie des graphes, tome 2, Éditions Dunod, Paris, 1970. | MR