Collaboration has evolved as a key component of many modern supply chains, supporting the competitive advantages of companies in a range of operations from manufacturing to sales. With this viewpoint, the present paper develops an integrated inventory model in which manufacturing is carried out at the vendor’s end so as to fulfill demand at the buyer’s doorway. As the production process is presumed to be imperfect it shifts from an “in-control” state to “out-of-control” state at any random time and yields non-conforming items. The vendor uses regular preventive maintenance actions for the efficient operation of the production system and offers free minimal repair warranty on the products sold to the buyer. Along with preventive maintenance actions the vendor also uses the rework process and restoration process as effective steps towards minimizing the imperfections of the production system. The proposed model solves the non-linear cost minimization problem through a generalized reduced gradient method by using Lingo 15.0. The aim is to jointly optimize the order size, backorder size and the number of shipments in order to minimize the integrated cost of the vendor and the buyer. Numerical analysis and sensitivity analysis is performed on key parameters that render some important supervisory insights.
Accepté le :
Première publication :
Publié le :
DOI : 10.1051/ro/2019029
Mots-clés : Inventory, imperfect production systems, preventive maintenance, warranty, shortages
@article{RO_2020__54_2_435_0, author = {Khanna, Aditi and Gautam, Prerna and Sarkar, Biswajit and Jaggi, Chandra K.}, title = {Integrated vendor{\textendash}buyer strategies for imperfect production systems with maintenance and warranty policy}, journal = {RAIRO - Operations Research - Recherche Op\'erationnelle}, pages = {435--450}, publisher = {EDP-Sciences}, volume = {54}, number = {2}, year = {2020}, doi = {10.1051/ro/2019029}, mrnumber = {4069303}, language = {en}, url = {http://www.numdam.org/articles/10.1051/ro/2019029/} }
TY - JOUR AU - Khanna, Aditi AU - Gautam, Prerna AU - Sarkar, Biswajit AU - Jaggi, Chandra K. TI - Integrated vendor–buyer strategies for imperfect production systems with maintenance and warranty policy JO - RAIRO - Operations Research - Recherche Opérationnelle PY - 2020 SP - 435 EP - 450 VL - 54 IS - 2 PB - EDP-Sciences UR - http://www.numdam.org/articles/10.1051/ro/2019029/ DO - 10.1051/ro/2019029 LA - en ID - RO_2020__54_2_435_0 ER -
%0 Journal Article %A Khanna, Aditi %A Gautam, Prerna %A Sarkar, Biswajit %A Jaggi, Chandra K. %T Integrated vendor–buyer strategies for imperfect production systems with maintenance and warranty policy %J RAIRO - Operations Research - Recherche Opérationnelle %D 2020 %P 435-450 %V 54 %N 2 %I EDP-Sciences %U http://www.numdam.org/articles/10.1051/ro/2019029/ %R 10.1051/ro/2019029 %G en %F RO_2020__54_2_435_0
Khanna, Aditi; Gautam, Prerna; Sarkar, Biswajit; Jaggi, Chandra K. Integrated vendor–buyer strategies for imperfect production systems with maintenance and warranty policy. RAIRO - Operations Research - Recherche Opérationnelle, Tome 54 (2020) no. 2, pp. 435-450. doi : 10.1051/ro/2019029. http://www.numdam.org/articles/10.1051/ro/2019029/
[1] Optimal lot sizing, process quality improvement and setup cost reduction. Oper. Res. 34 (1986) 137–144. | DOI | Zbl
,[2] Economic production cycles with imperfect production processes. IIE Trans. 18 (1986) 48–55. | DOI
and ,[3] An optimal production run length in deteriorating production processes. Int. J. Prod. Econ. 58 (1999) 183–189. | DOI
and ,[4] Economic lot scheduling problem with imperfect production processes. J. Oper. Res. Soc. 51 (2000) 875–881. | DOI | Zbl
and ,[5] Economic production quantity model for items with imperfect quality. Int. J. Prod. Econ. 64 (2000) 59–64. | DOI
and ,[6] An integrated vendor–buyer cooperative inventory model for items with imperfect quality. Prod. Plan. Control 13 (2002) 355–361. | DOI
,[7] An optimal production run time with imperfect production processes and allowable shortages. Comput. Oper. Res. 30 (2003) 483–490. | DOI | Zbl
and ,[8] Optimal production run length for products sold with warranty. Eur. J. Oper. Res. 120 (2000) 575–582. | DOI | Zbl
, and ,[9] Optimal lot-sizing, quality improvement and inspection errors for multistage production systems. Int. J. Prod. Res. 41 (2003) 65–79. | DOI | Zbl
and ,[10] An optimal policy for a single-vendor single-buyer integrated production–inventory problem with process unreliability consideration. Int. J. Prod. Econ. 91 (2004) 91–98. | DOI
,[11] Implementation of JIT purchasing: an integrated approach. Prod. Plan. Control 8 (1997) 152–157. | DOI
and ,[12] Joint determination of production run length and number of standbys in a deteriorating production process. Eur. J. Oper. Res. 162 (2005) 359–371. | DOI | MR | Zbl
and ,[13] Optimal production run length for products sold with warranty in an imperfect production system with allowable shortages. Math. Comput. Model. 44 (2006) 319–331. | DOI | MR | Zbl
and ,[14] On a volume flexible inventory model for items with an imperfect production system. Int. J. Oper. Res. 2 (2006) 64–80. | DOI | Zbl
, and ,[15] An imperfect production process in a volume flexible inventory model. Int. J. Prod. Econ. 105 (2007) 548–559. | DOI
, and ,[16] An optimal batch size for an imperfect production system with quality assurance and rework. Int. J. Prod. Res. 45 (2007) 3191–3214. | DOI | Zbl
, and ,[17] A note on: an optimal batch size for an imperfect production system with quality assurance and rework. Int. J. Prod. Res. 47 (2009) 7063–7067. | DOI | Zbl
, and ,[18] A production–inventory model in an imperfect production process. Eur. J. Oper. Res. 200 (2010) 451–464. | DOI | MR | Zbl
,[19] Production lot sizing with the reworking of imperfect quality items produced. Prod. Plan. Control 12 (2001) 584–590. | DOI
and ,[20] Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging. Eng. Optim. 35 (2003) 427–437. | DOI
,[21] Effects of random defective rate and imperfect rework process on economic production quantity model. Jpn J. Ind. Appl. Math. 21 (2004) 375. | DOI | MR | Zbl
, and ,[22] Numerical method for determination of reworking or scraping the defective items in a finite production rate model. Int. J. Numer. Methods Biomed. Eng. 22 (2006) 377–386. | Zbl
, and ,[23] An economic production lot size model in an imperfect production system. Eur. J. Oper. Res. 201 (2010) 158–170. | DOI | Zbl
,[24] Optimal reliability, production lot size and safety stock in an imperfect production system. Int. J. Math. Oper. Res. 2 (2010) 467–490. | DOI | MR | Zbl
, and ,[25] An economic production quantity model with stochastic demand in an imperfect production system. Int. J. Serv. Oper. Manage. 9 (2011) 259–283.
, and ,[26] Optimal vendor investment for reducing defect rate in a vendor–buyer integrated system with imperfect production process. Int. J. Prod. Econ. 155 (2014) 222–228. | DOI
and ,[27] In-plant material buffer sizes for pull system and level-material-shipping environments in the automotive industry. Int. J. Prod. Res. 35 (1997) 1213–1228. | DOI | Zbl
, and ,[28] A continuous-flow model for production networks with finite buffers, unreliable machines, and multiple products. Int. J. Prod. Res. 35 (1997) 381–397. | DOI | Zbl
and ,[29] An improved decomposition method for the analysis of production lines with unreliable machines and finite buffers. Int. J. Prod. Res. 37 (1999) 1093–1117. | DOI | Zbl
,[30] Buffer capacity for accommodating machine downtime in serial production lines. Int. J. Prod. Res. 40 (2002) 601–624. | DOI | Zbl
, , and ,[31] The effect of breakdowns on U-shaped production lines. Int. J. Prod. Res. 38 (2000) 353–364. | DOI | Zbl
,[32] Optimal just-in-time buffer inventory for regular preventive maintenance. Int. J. Prod. Econ. 74 (2001) 157–161. | DOI
and ,[33] Optimal buffer inventory and preventive maintenance for an imperfect production process. Int. J. Prod. Res. 42 (2004) 959–974. | DOI
, and ,[34] Lot sizing in a deteriorating production system under inspections, imperfect maintenance and reworks. Oper. Res. 14 (2014) 29–50.
and ,[35] An EMQ model in an imperfect production process. Int. J. Syst. Sci. 41 (2010) 635–646. | DOI | MR | Zbl
and ,[36] Preventive maintenance and optimal buffer inventory for products sold with warranty in an imperfect production system. Int. J. Prod. Res. 50 (2012) 6763–6774. | DOI
,[37] A summary of imperfect preventive maintenance policies with minimal repair. RAIRO-Oper. Res. 14 (1980) 249–255. | DOI | Numdam | MR | Zbl
,[38] Optimal design of sales and maintenance under the renewable warranty. RAIRO-Oper. Res. 52 (2018) 529–542. | DOI | Numdam | MR
and ,[39] Integrated production, quality control and condition-based maintenance for imperfect production systems. Reliab. Eng. Syst. Saf. 175 (2018) 251–264. | DOI
, and ,[40] An integrated inventory model for a single supplier-single customer problem. Int. J. Prod. Res. 15 (1977) 107–111. | DOI
,[41] A joint economic lot size model for purchaser and vendor. Decis. Sci. 17 (1986) 292–311. | DOI
,[42] “A joint economic lot size model for purchaser and vendor”: a comment. Decis. Sci. 19 (1988) 236–241. | DOI
,[43] Integrated inventory models: the buyer–vendor coordination. Eur. J. Oper. Res. 41 (1989) 261–269. | DOI
and ,[44] Determination of economic production–shipment policy for a single-vendor-single-buyer system. Eur. J. Oper. Res. 121 (2000) 175–178. | DOI | Zbl
and ,[45] A one-vendor multi-buyer integrated inventory model: a comment’.’. Eur. J. Oper. Res. 82 (1995) 209–210. | DOI | Zbl
,[46] The single-vendor single-buyer integrated production-inventory model with a generalised policy. Eur. J. Oper. Res. 97 (1997) 493–499. | DOI | Zbl
,[47] An integrated single-vendor single-buyer inventory system with shortage derived algebraically. Prod. Plan. Control 14 (2003) 555–561. | DOI
and ,[48] A joint economic-lot-size model for purchaser and vendor. Decis. Sci. 17 (1986) 292–311. | DOI
,[49] An integrated JIT inventory model. Int. J. Oper. Prod. Manage. 15 (1995) 237–244. | DOI
and ,[50] An improvement of an integrated single-vendor single-buyer inventory model with shortage. Prod. Plan. Control 19 (2008) 275–277. | DOI
,[51] An integrated vendor–buyer cooperative inventory model in an imperfect production process with shortage backordering. Int. J. Prod. Adv. Manuf. Technol. 65 (2013) 493–505. | DOI
and ,[52] Single-vendor single-buyer inventory model with discrete delivery order, random machine unavailability time and lost sales. Int. J. Prod. Econ. 143 (2013) 574–579. | DOI
and ,[53] Joint determination of the lot size and number of shipments for a family of integrated vendor–buyer systems considering defective products. Int. J. Syst. Sci. 46 (2015) 1705–1716. | DOI | Zbl
, and ,[54] Optimal and simple algorithms to solve integrated procurement-production-inventory problem without/with shortage. RAIRO-Oper. Res. 52 (2018) 755–778. | DOI | Numdam | MR | Zbl
, and ,[55] Vendor-buyer integrated production-inventory system for imperfect quality item under trade credit finance and variable setup cost. RAIRO-Oper. Res. 52 (2018) 1277–1293. | DOI | Numdam | MR | Zbl
, and ,[56] A supply chain coordination mechanism for common items subject to failure in the electronics, defense, and medical industries. Int. J. Prod. Econ. 203 (2018) 164–173. | DOI
, , and ,Cité par Sources :