Most of the works in EPQ model considered that retailer’s purchasing cost of an order should be paid to the manufacturer at the time of its delivering. In the real world situations, few manufacturers may be expect to receive full or a fraction of the purchasing cost in advance and sometimes allow to prepayment into several equal instalments. Also, in classical inventory models it is assumed that no defective items are produced, but real production process may shift from in-control state to out-of-control state due to occurrence of some assignable causes, which results in the quality loss of items. To make the study more realistic, we develop an imperfect production inventory model that incorporates random carbon emissions under consecutive prepayments. Also, production processes are assumed to be imperfect, so they can produce some defective items and some portion of them are reworked in the same cycle. In addition, it is assumed that manufacturer offers an advanced payment based free transportation to the retailer. Carbon emissions are associated with the decisions of production and transportation from manufacturer to retailer. A carbon emission tax is need to pay by the manufacturer due to the environmental regulations. Numerical examples illustrate the proposed models and sensitivity analysis provides some managerial insights for managers.
Mots-clés : Inventory, stochastic, inspection, production models, management decision making
@article{RO_2020__54_4_1103_0, author = {Manna, Amalesh Kumar and Das, Barun and Tiwari, Sunil}, title = {Impact of carbon emission on imperfect production inventory system with advance payment base free transportation}, journal = {RAIRO - Operations Research - Recherche Op\'erationnelle}, pages = {1103--1117}, publisher = {EDP-Sciences}, volume = {54}, number = {4}, year = {2020}, doi = {10.1051/ro/2019015}, mrnumber = {4100698}, language = {en}, url = {http://www.numdam.org/articles/10.1051/ro/2019015/} }
TY - JOUR AU - Manna, Amalesh Kumar AU - Das, Barun AU - Tiwari, Sunil TI - Impact of carbon emission on imperfect production inventory system with advance payment base free transportation JO - RAIRO - Operations Research - Recherche Opérationnelle PY - 2020 SP - 1103 EP - 1117 VL - 54 IS - 4 PB - EDP-Sciences UR - http://www.numdam.org/articles/10.1051/ro/2019015/ DO - 10.1051/ro/2019015 LA - en ID - RO_2020__54_4_1103_0 ER -
%0 Journal Article %A Manna, Amalesh Kumar %A Das, Barun %A Tiwari, Sunil %T Impact of carbon emission on imperfect production inventory system with advance payment base free transportation %J RAIRO - Operations Research - Recherche Opérationnelle %D 2020 %P 1103-1117 %V 54 %N 4 %I EDP-Sciences %U http://www.numdam.org/articles/10.1051/ro/2019015/ %R 10.1051/ro/2019015 %G en %F RO_2020__54_4_1103_0
Manna, Amalesh Kumar; Das, Barun; Tiwari, Sunil. Impact of carbon emission on imperfect production inventory system with advance payment base free transportation. RAIRO - Operations Research - Recherche Opérationnelle, Tome 54 (2020) no. 4, pp. 1103-1117. doi : 10.1051/ro/2019015. http://www.numdam.org/articles/10.1051/ro/2019015/
[1] Carbon foot print and the management of supply chains: Insights from simple models. IEEE Trans. Auto. Sci. Eng. 10 (2013) 99–116. | DOI
, and ,[2] On optimal batch sizing in a multistage production system with rework consideration. Eur. J. Oper. Res. 196 (2009) 1238–1244. | DOI | MR | Zbl
,[3] Logistic planning of rework with deteriorating work-in-process. Int. J. Prod. Econ. 88 (2004) 51–59. | DOI
and ,[4] Deteriorating manufacturing system with selling price discount under random machine breakdown. Int. J. Comput. Eng. Manage. 20 (2017) 8–17.
, and ,[5] Note on: Economic production quantity model for items with imperfect quality- a practical approach. Int. J. Prod. Econ. 77 (2002) 85–87. | DOI
and ,[6] Economic production quantity with imperfect production system. Ind. Eng. J. 34 (2005) 33–36.
and ,[7] Carbon emissions in a multi-echelon production-inventory model with lead time constraints. Int. J. Prod. Econ. 164 (2014) 292–307. | DOI
, and ,[8] How many parts to make at once factory. Mag. Manage. 10 (1913) 135–136.
,[9] Assessing the impact of cost optimization based on infrastructure modelling on CO2 emissions. Int. J. Prod. Econ. 131 (2011) 313–321. | DOI
, , , and ,[10] Managing carbon foot prints in inventory management. Int. J. Prod. Econ. 132 (2011) 178–185. | DOI
, and ,[11] Production lot sizing with the reworking of imperfect quality items produced. Prod. Plann. Control 12 (2001) 584–590. | DOI
and ,[12] Cost minimizing scheduling of work and rework processes on a single facility under deterioration of reworkables. Int. J. Prod. Econ. 105 (2007) 345–356. | DOI
, , and ,[13] A fuzzy imperfect production and repair inventory model with time dependent demand, production and repair rates under inflationary conditions. RAIRO: OR 52 (2018) 217–239. | DOI | Numdam | MR | Zbl
, , , and ,[14] Learning and screening errors in an EPQ inventory model for supply chains with stochastic lead time demands. Int. J. Prod. Res. 55 (2017) 4816–4832. | DOI
, and ,[15] Optimal economic production quantity policy for a parallel system with repair, rework, free-repair warranty and maintenance. Int. J. Prod. Res. 54 (2016) 6265–6280. | DOI
,[16] Pricing and lot-sizing policies for perishable products with advance-cash-credit payments by a discounted cash-flow analysis. Int. J. Prod. Econ. 193 (2017) 578–589. | DOI
, , and ,[17] A supply chain model for imperfect production system with stochastic lead time demand. J. Manage. Anal. 5 (2018) 309–333.
, and ,[18] An EPQ model with promotional demand in random planning horizon: population varying genetic algorithm approach. J. Intell. Manuf. 27 (2016) 1–19.
, , and ,[19] Imperfect production inventory model with production rate dependent defective rate and advertisement dependent demand. Comput. Ind. Eng. 104 (2017) 9–22. | DOI
, and ,[20] Two layers green supply chain imperfect productioninventory model under bi-level credit period. TÉKHNE – Rev. Appl. Manage. Stud. 15 (2017) 124–142.
, , and ,[21] Two layers supply chain in an imperfect production inventory model with two storage facilities under reliability consideration. J. Ind. Prod. Eng. 35 (2018) 57–73.
, and ,[22] Controlling GHG emission from industrial waste perusal of production inventory model with fuzzy pollution parameters. Int. J. Syst. Sci. Oper. Logist. 6 (2019) 368–393.
, and ,[23] Economic production quantity model considering warm-up period in a cleaner production environment. Int. J. Prod. Res. 57 (2016) 4547–4560. | DOI
, and ,[24] Environmental integrated production planning for ammonia synthesis. Eur. J. Oper. Res. 97 (1997) 327–336. | DOI | Zbl
, , and ,[25] Economic production cycles with imperfect production process. IIE Trans. 18 (1986) 48–55. | DOI
and ,[26] Economic production quantity model for items with imperfect quality. Int. J. Prod. Econ. 64 (2000) 59–64. | DOI
and ,[27] A production-inventory model in an imperfect production process. Eur. J. Oper. Res. 200 (2010) 451–464. | DOI | MR | Zbl
,[28] An economic production lot size model in an imperfect production system. Eur. J. Oper. Res. 201 (2010) 158–170. | DOI | Zbl
,[29] An inventory model with reliability in an imperfect production process. Appl. Math. Comput. 218 (2012) 4881–4891. | MR | Zbl
,[30] Optimal production run time and inspection errors in an imperfect production system with warranty. J. Ind. Manage. Opt. 14 (2018) 267–282. | DOI | MR
, and ,[31] Optimal buffer inventory and inspection errors in an imperfect production system with preventive maintenance. Int. J. Adv. Manuf. Technol. 90 (2017) 1–16.
, , ,[32] An economic order quantity model with multiple partial prepayments and partial backordering, Math. Comput. Model. 57 (2013) 311–323. | DOI | MR | Zbl
, , and ,[33] An economic order quantity model for deteriorating items in a purchasing system with multiple prepayments. Appl. Math. Model. 38(23) (2014) 5357–5366. | DOI | MR
,[34] Inventory lot-size policies for deteriorating items with expiration dates and advance payments. Appl. Math. Model. 40 (2016) 8605–8616. | DOI | MR
, , , and ,[35] Joint pricing and inventory model for deteriorating items with expiration dates and partial backlogging under two-level partial trade credits in supply chain. Int. J. Prod. Econ. 200 (2018) 16–36. | DOI
, , and ,[36] Corporate optimal production planning with varying environmental costs: A grey compromise programming approach. Eur. J. Oper. Res. 155 (2004) 68–95. | DOI | Zbl
and ,[37] Optimal advance payment scheme involving fixed per-payment costs. Omega 24 (1996) 577–582. | DOI
,Cité par Sources :