A neoteric approach to geometric shipment policy in an integrated supply chain with setup cost reduction and freight cost using service level constraint
RAIRO - Operations Research - Recherche Opérationnelle, Tome 54 (2020) no. 3, pp. 653-673.

This paper explores a neoteric approach to geometric shipment policy and concerns the impact of controllable lead time, setup cost reduction, lost sales caused by stock-out and freight cost within an integrated vendor–buyer supply chain configuration using service-level constraint. In particular, the transportation cost is a function of shipping weight, distance and transportation modes. In other words, truckload (TL) and less-than-truckload (LTL) shipments. A heuristic model is developed to minimize the joint expected total cost (JETC), when the mode of transportation is limited to TL and LTL shipments. Numerical examples including the sensitivity analysis with some managerial insights of system parameters is implemented to endorse the outcome of the supply chain models.

DOI : 10.1051/ro/2019011
Classification : 90B05
Mots-clés : Integrated inventory model, freight cost, geometric shipment policy, setup cost reduction, lead time
@article{RO_2020__54_3_653_0,
     author = {Hemapriya, Selvaraj and Uthayakumar, Ramasamy},
     title = {A neoteric approach to geometric shipment policy in an integrated supply chain with setup cost reduction and freight cost using service level constraint},
     journal = {RAIRO - Operations Research - Recherche Op\'erationnelle},
     pages = {653--673},
     publisher = {EDP-Sciences},
     volume = {54},
     number = {3},
     year = {2020},
     doi = {10.1051/ro/2019011},
     mrnumber = {4075322},
     zbl = {1437.90010},
     language = {en},
     url = {http://www.numdam.org/articles/10.1051/ro/2019011/}
}
TY  - JOUR
AU  - Hemapriya, Selvaraj
AU  - Uthayakumar, Ramasamy
TI  - A neoteric approach to geometric shipment policy in an integrated supply chain with setup cost reduction and freight cost using service level constraint
JO  - RAIRO - Operations Research - Recherche Opérationnelle
PY  - 2020
SP  - 653
EP  - 673
VL  - 54
IS  - 3
PB  - EDP-Sciences
UR  - http://www.numdam.org/articles/10.1051/ro/2019011/
DO  - 10.1051/ro/2019011
LA  - en
ID  - RO_2020__54_3_653_0
ER  - 
%0 Journal Article
%A Hemapriya, Selvaraj
%A Uthayakumar, Ramasamy
%T A neoteric approach to geometric shipment policy in an integrated supply chain with setup cost reduction and freight cost using service level constraint
%J RAIRO - Operations Research - Recherche Opérationnelle
%D 2020
%P 653-673
%V 54
%N 3
%I EDP-Sciences
%U http://www.numdam.org/articles/10.1051/ro/2019011/
%R 10.1051/ro/2019011
%G en
%F RO_2020__54_3_653_0
Hemapriya, Selvaraj; Uthayakumar, Ramasamy. A neoteric approach to geometric shipment policy in an integrated supply chain with setup cost reduction and freight cost using service level constraint. RAIRO - Operations Research - Recherche Opérationnelle, Tome 54 (2020) no. 3, pp. 653-673. doi : 10.1051/ro/2019011. http://www.numdam.org/articles/10.1051/ro/2019011/

K. Amasaka, New (Just In Time [JIT]): a new management technology principle at Toyota. Int. J. Prod. Econ. 80 (2002) 135–144. | DOI

K. Annadurai and R. Uthayakumar, Ordering cost reduction in probabilistic inventory model with controllable lead time and a service level. Int. J. Manage. Sci. Eng. Manage. 5 (2010) 403–410.

M. Ben-Daya and M. Hariga, Integrated single vendor single buyer model with stochastic demand and variable lead time. Int. J. Prod. Econ. 92 (2004) 75–80. | DOI

S. Bylka, Competitive and cooperative policies for the vendor–buyer system. Int. J. Prod. Econ. 81 (2003) 533–544. | DOI

H.C. Chang, L.Y. Ouyang, K.S. Wu and C.H. Ho, Integrated vendor–buyer cooperative inventory models with controllable lead time and ordering cost reduction. Eur. J. Oper. Res. 170 (2006) 481–495. | DOI | MR | Zbl

C.K. Chen, H.C. Chang and L.Y. Ouyang, A continuous review inventory model with ordering cost dependent on lead time. Int. J. Inf. Manage. Sci. 12 (2001) 1–13. | MR | Zbl

P. Chu, K.L. Yang and P.S. Chen, Improved inventory models with service level and lead time. Comput. Oper. Res. 32 (2005) 285–296. | DOI | MR | Zbl

I. Darma Wangsa and H.M. Wee, An integrated vendor–buyer inventory model with transportation cost and stochastic demand. Int. J. Syst. Sci. Oper. Logist. (2017) 1–15.

K. Ertogral, M. Darwish and M. Ben-Daya, Production and shipment lot sizing in a vendor–buyer supply chain with transportation cost. Eur. J. Oper. Res. 176 (2007) 1592–1606. | DOI | Zbl

B.C. Giri and S. Sharma, Lot sizing and unequal-sized shipment policy for an integrated production-inventory system. Int. J. Syst. Sci. 45 (2014) 888–901. | DOI | MR | Zbl

S.K. Goyal, A joint economic-lot-size model for purchaser and vendor: a comment. Decis. Sci. 19 (1988) 236–241. | DOI

S.K. Goyal, A one-vendor multi-buyer integrated inventory model: a comment. Eur. J. Oper. Res. 82 (1995) 209–210. | DOI | Zbl

S.K. Goyal and F. Nebebe, Determination of economic production-shipment policy for a single-vendor-single-buyer system. Eur. J. Oper. Res. 121 (2000) 175–178. | DOI | Zbl

S. Hemapriya and R. Uthayakumar, Ordering cost dependent lead time in integrated inventory model. Commun. Appl. Anal. 20 (2016) 411–439.

S. Hemapriya and R. Uthayakumar, An inventory model with uncertain demand and lost sales reduction under service level constraint. Int. J. Syst. Assur. Eng. Manage. 8 (2017) 1399–1418. | DOI

R.M. Hill, The single-vendor single-buyer integrated production-inventory model with a generalized policy. Eur. J. Oper. Res. 97 (1997) 493–499. | DOI | Zbl

M.A. Hoque and S.K. Goyal, A heuristic solution procedure for an integrated inventory system under controllable lead-time with equal or unequal sized batch shipments between a vendor and a buyer. Int. J. Prod. Econ. 102 (2006) 217–225. | DOI

W.A. Jauhari, A. Fitriyani and A. Aisyati, An integrated inventory model for single-vendor single-buyer system with freight rate discount and stochastic demand. Int. J. Oper. Res. 25 (2016) 327–350. | DOI | MR

J.K. Jha and K. Shanker, Two-echelon supply chain inventory model with controllable lead time and service level constraint. Comput. Ind. Eng. 57 (2009) 1096–1104. | DOI

S.J. Kim and B. Sarkar, Supply chain model with stochastic lead time, trade-credit financing, and transportation discounts. Math. Prob. Eng. 2017 (2017). | MR | Zbl

R.A.C. Leuveano, F.A.B. Jafar and M.R.B. Muhamad, Incorporating transportation costs into integrated inventory model for single supplier and single purchaser. Adv. Sci. Lett. 20 (2014) 290–293. | DOI

A. Mendoza and J.A. Ventura, Incorporating quantity discounts to the EOQ model with transportation costs. Int. J. Prod. Econ. 113 (2008) 754–765. | DOI

I. Moon and S. Choi, Technical note on lead time and distributional assumptions in continuous review inventory models. Comput. Oper. Res. 25 (1998) 1007–1012. | DOI | MR | Zbl

L.Y. Ouyang and K.S. Wu, Mixture inventory model involving variable lead time with a service level constraint. Comput. Oper. Res. 24 (1997) 875–882. | DOI | MR | Zbl

J.C.H. Pan and Y.C. Hsiao, Inventory models with back-order discount and variable lead time. Int. J. Syst. Sci. 32 (2001) 925–929. | DOI | MR | Zbl

A. Pandey, M. Masin and V. Prabhu, Adaptive logistic controller for integrated design of distributed supply chains. J. Manuf. Syst. 26 (2007) 108–115. | DOI

E.L. Porteus, Investing in reduced setups in the EOQ model. Manage. Sci. 31 (1985) 998–1010. | DOI | Zbl

E.L. Porteus, Optimal lot sizing, process quality improvement and setup cost reduction. Oper. Res. 34 (1986) 137–144. | DOI | Zbl

S. Priyan and R. Uthayakumar, Continuous review inventory model with controllable lead time, lost sales rate and order processing cost when the received quantity is uncertain. J. Manuf. Syst. 34 (2015) 23–33. | DOI

B. Sarkar and I. Moon, Improved quality, setup cost reduction, and variable backorder costs in an imperfect production process. Int. J. Prod. Econ. 155 (2014) 204–213. | DOI

B. Sarkar, K. Chaudhuri and I. Moon, Manufacturing setup cost reduction and quality improvement for the distribution free continuous-review inventory model with a service level constraint. J. Manuf. Syst. 34 (2015) 74–82. | DOI

J.T. Teng, L.E. Cárdenas-Barrón and K.R. Lou, The economic lot size of the integrated vendor–buyer inventory system derived without derivatives: a simple derivation. Appl. Math. Comput. 217 (2011) 5972–5977. | MR | Zbl

A. Toptal, Replenishment decisions under an all-units discount schedule and stepwise freight costs. Eur. J. Oper. Res. 198 (2009) 504–510. | DOI | MR | Zbl

C.S. Tsou, H.H. Fang, H.C. Lo and C.H. Huang, A study of cooperative advertising in a manufacturer-retailer supply chain. Int. J. Inf. Manage. Sci. 20 (2009) 15–26. | MR | Zbl

R. Uthayakumar and M. Rameswari, An integrated inventory model for a single vendor and single buyer with order-processing cost reduction and process mean. Int. J. Prod. Res. 50 (2012) 2910–2924. | DOI

A. Villa, Introducing some supply chain management problem. Int. J. Prod. Econ. 73 (2001) 1–4. | DOI

S. Viswanathan, Optimal strategy for the integrated vendor–buyer inventory model. Eur. J. Oper. Res. 105 (1998) 38–42. | DOI | Zbl

P.C. Yang and H.M. Wee, An arborescent inventory model in a supply chain system. Prod. Planning Control 12 (2001) 728–735. | DOI

T. Zhang, L. Liang, Y. Yu and Y. Yan, An integrated vendor-managed inventory model for a two-echelon system with order cost reduction. Int. J. Prod. Econ. 109 (2007) 241–253. | DOI

Cité par Sources :