Cost reduction for setup and improvement of processes quality are the main target of this research along with free minimal repair warranty for an imperfect production System. This paper deals with the effect of setup cost reduction and process quality improvement on the optimal production cycle time for an imperfect production process with free product minimal repair warranty. Here the production system is subject to a random breakdown from an controlled system to an out-of-control state. Shortages are fully backlogged. The main target to minimize the total cost by simultaneously optimizing the production run time, setup cost, and process quality. A solution algorithm with some numerical experiments are provided such as the proposed model can illustrate briefly. Sensitivity analysis section is decorated for the optimal solution of the model with respect to major cost parameters of the system are carried out, and the implications of the analysis are discussed.
Accepté le :
Première publication :
Publié le :
DOI : 10.1051/ro/2018101
Mots-clés : Imperfect production, setup cost reduction, process quality improvement, warranty, shortages
@article{RO_2020__54_1_251_0, author = {Guchhait, Rekha and Dey, Bikash Koli and Bhuniya, Shaktipada and Ganguly, Baisakhi and Mandal, Buddhadev and Bachar, Raj Kumar and Sarkar, Biswajit and Wee, Huiming and Chaudhuri, Kripasindhu}, title = {Investment for process quality improvement and setup cost reduction in an imperfect production process with warranty policy and shortages}, journal = {RAIRO - Operations Research - Recherche Op\'erationnelle}, pages = {251--266}, publisher = {EDP-Sciences}, volume = {54}, number = {1}, year = {2020}, doi = {10.1051/ro/2018101}, mrnumber = {4062454}, zbl = {1437.90009}, language = {en}, url = {http://www.numdam.org/articles/10.1051/ro/2018101/} }
TY - JOUR AU - Guchhait, Rekha AU - Dey, Bikash Koli AU - Bhuniya, Shaktipada AU - Ganguly, Baisakhi AU - Mandal, Buddhadev AU - Bachar, Raj Kumar AU - Sarkar, Biswajit AU - Wee, Huiming AU - Chaudhuri, Kripasindhu TI - Investment for process quality improvement and setup cost reduction in an imperfect production process with warranty policy and shortages JO - RAIRO - Operations Research - Recherche Opérationnelle PY - 2020 SP - 251 EP - 266 VL - 54 IS - 1 PB - EDP-Sciences UR - http://www.numdam.org/articles/10.1051/ro/2018101/ DO - 10.1051/ro/2018101 LA - en ID - RO_2020__54_1_251_0 ER -
%0 Journal Article %A Guchhait, Rekha %A Dey, Bikash Koli %A Bhuniya, Shaktipada %A Ganguly, Baisakhi %A Mandal, Buddhadev %A Bachar, Raj Kumar %A Sarkar, Biswajit %A Wee, Huiming %A Chaudhuri, Kripasindhu %T Investment for process quality improvement and setup cost reduction in an imperfect production process with warranty policy and shortages %J RAIRO - Operations Research - Recherche Opérationnelle %D 2020 %P 251-266 %V 54 %N 1 %I EDP-Sciences %U http://www.numdam.org/articles/10.1051/ro/2018101/ %R 10.1051/ro/2018101 %G en %F RO_2020__54_1_251_0
Guchhait, Rekha; Dey, Bikash Koli; Bhuniya, Shaktipada; Ganguly, Baisakhi; Mandal, Buddhadev; Bachar, Raj Kumar; Sarkar, Biswajit; Wee, Huiming; Chaudhuri, Kripasindhu. Investment for process quality improvement and setup cost reduction in an imperfect production process with warranty policy and shortages. RAIRO - Operations Research - Recherche Opérationnelle, Tome 54 (2020) no. 1, pp. 251-266. doi : 10.1051/ro/2018101. http://www.numdam.org/articles/10.1051/ro/2018101/
[1] Investing in reduced setups in the EOQ model. Manage. Sci. 31 (1985) 998–1010. | DOI | Zbl
,[2] Production lot sizing with machine breakdown. Manage. Sci. 38 (1992) 104–123. | DOI | Zbl
, and ,[3] Production batching with machine breakdown and safety stocks. Oper. Res. 40 (1992) 959–971. | DOI | Zbl
, and ,[4] Some stochastic inventory models with deterministic variable lead time. Eur. J. Oper. Res. 113 (1999) 42–51. | DOI | Zbl
, ,[5] An optimal production run length in deteriorating production processes. Int. J. Prod. Econ. 58 (1999) 183–189. | DOI
and ,[6] Optimal batch size and investment in multistage production systems with scrap. Prod. Plan. Cont. 8 (1997) 586–596. | DOI
, and ,[7] An EPQ model with setup cost and process quality as functions of capital expenditure. Appl. Math. Model. 31 (2007) 10–17. | DOI | Zbl
,[8] Product inspection policy for an imperfect production system with inspection errors and warranty cost. Eur. J. Oper. Res. 248 (2016) 263–271. | DOI | Zbl
and ,[9] Economic production quantity with imperfect production system. Ind. Eng. J. 34 (2005) 33–36.
and ,[10] On an imperfect production process in a volume flexible inventory model. Int. J. Prod. Econ. 105 (2007) 548–559. | DOI
, and ,[11] On optimal batch sizing in a multi-stage production system with rework consideration. Eur. J. Oper. Res. 196 (2009) 1238–1244. | DOI | MR | Zbl
,[12] A production-inventory model in an imperfect production process. Eur. J. Oper. Res. 200 (2010) 451–464. | DOI | MR | Zbl
,[13] A production-inventory model of imperfect quality products in a three-layer supply chain. Decis. Sup. Syst. 50 (2011) 539–547. | DOI
,[14] An inventory model with reliability in an imperfect production process, Appl. Math. Comput. 218 (2012) 4881–4891. | MR | Zbl
,[15] An economic order manufacturing quantity model with probabilistic deterioration in a production system. Econ. Model. 31 (2013) 245–252. | DOI
and ,[16] An EMQ model with price and time dependent demand under the effect of reliability and inflation. Appl. Math. Comput. 231 (2014) 414–421. | MR | Zbl
, and ,[17] An integrated inventory model with quality improvement and two-part credit policy. TOP 22 (2014) 1042–1061. | DOI | MR | Zbl
, , and ,[18] An economic production quantity model with random defective rate, rework process and backorders for a single stage production system. J. Manuf. Syst. 33 (2014) 423–435. | DOI
, , and ,[19] A note on the heuristic for replenishment of trended inventories considering shortages. J. Oper. Res. Soci. 38 (1987) 459–463. | DOI | Zbl
and ,[20] The economic production quantity (EPQ) with shortage derived algebraically. Int. J. Prod. Econ. 70 (2001) 289–292. | DOI
,[21] A production inventory model for a deteriorating item with trended demand and shortages. Eur. J. Oper. Res. 157 (2004) 357–371. | DOI | MR | Zbl
, and ,[22] Economic production quantity with rework process at a single-stage manufacturing system with planned backorders. Comput. Ind. Eng. 57 (2009) 1105–1113. | DOI
,[23] Preventive maintenance and optimal buffer inventory for products sold with warranty in an imperfect production system. Int. J. Prod. Res. 50 (2012) 6763–6774. | DOI
,[24] Random sales price-sensitive stochastic demand: an imperfect production model with free repair warranty. J. Adv. Manage. Res. 14 (2017) 408–424. | DOI
and ,[25] Managing a two-echelon supply chain with price, warranty and quality dependent demand. Cogent Bus. Manage. 2 (2015) 1–13. | DOI
, and ,[26] The derivation of EOQ/EPQ inventory models with two backorders costs using analytic geometry and algebra. Appl. Math. Model. 35 (2011) 2394–2407. | DOI | MR | Zbl
,[27] An improved inventory model with partial backlogging, time varying deterioration and stock-dependent demand. Econ. Model. 30 (2013) 924–932. | DOI
and ,[28] Two-echelon supply chain model with manufacturing quality improvement and setup cost reduction. J. Ind. Manage. Opt. 13 (2017) 1085–1104. | DOI | MR | Zbl
, , , and ,[29] An integrated inventory model involving discrete setup cost reduction, variable safety factor, selling-price dependent demand, and investment. RAIRO - Oper. Res. 53 (2019) 39–57. | DOI | Numdam | MR | Zbl
, , and ,[30] An inventory model with finite replenishment rate, trade credit policy and price-discount offer. J. Ind. Eng. 2013 (2013) 1–18.
, and ,[31] An imperfect production process for time varying demand with inflation and time value of money – an EMQ model. Exp. Syst. App. 38 (2011) 13543–13548.
, and ,[32] Optimal reliability, production lotsize and safety stock: an economic manufacturing quantity model. Int. J. Manage. Sci. Eng. Manage. 5 (2010) 192–202.
, and ,[33] Optimal selling price and lotsize with time varying deterioration and partial backlogging. App. Math. Comput. 217 (2010) 185–194. | DOI | MR | Zbl
,[34] A stock-dependent inventory model in an imperfect production process. Int. J. Procu. Manage. 3 (2010) 361–378.
, and ,[35] Optimal lot sizing, process quality improvement and setup cost reduction. Oper. Res. 34 (1986) 137–144. | DOI | Zbl
,[36] Mixture inventory model with backorders and lost sales for variable lead time. J. Oper. Res. Soc. 47 (1996) 829–832. | DOI | Zbl
, and ,[37] The learning effect on setup cost reduction for mixture inventory models with variable lead time. Asia-Pac. J. Oper. Res. 25 (2008) 513–529. | DOI | MR | Zbl
and ,[38] Improved quality, setup cost reduction, and variable backorder costs in an imperfect production process. Int. J. Prod. Econ. 155 (2014) 204–213. | DOI
and ,[39] Integrated vendor–buyer supply chain model with vendor’s setup cost reduction. Appl. Math. Comput. 224 (2013) 362–371. | MR | Zbl
and ,[40] An optimal production run time with imperfect production processes and allowable shortages. Comput. Oper. Res. 30 (2003) 483–490. | DOI | Zbl
and ,[41] Environmental and economic assessment of closed-loop supply chain with remanufacturing and returnable transport items. Comput. Ind. Eng. 111 (2017) 143–163. | DOI
, and ,[42] Process quality improvement and setup reduction in dynamic lot sizing. Int. J. Prod. Res. 31 (1993) 2693–2708. | DOI
, and ,[43] Zero Inventories. Dow Jones-Irwin, Homewood, IL, 1983.
,Cité par Sources :