This paper deals with an inventory model in which a percent of the items in the lot is imperfect. The supplier is far from the buyer. After the reception of the order, immediately the products are inspected and imperfect items are identified. Due to the fact that supplier is located at long distance and the demand is needed to cover, the imperfect items are replenished by perfect ones from a local supplier at higher cost. In addition, the imperfect items are withdrawn and sold at a salvaged price as second-degree items. The shortage is allowed and partially backordered. The following three cases are considered: Case I. The reordered items are received when inventory level is zero; Case II. The reordered items are received when the backordered quantity is equal to the imperfect items quantity; and Case III. The reordered items are received when shortage is still remained. These cases are studied and analyzed in detail. In each case, the aim is to obtain the optimal value of the length period and the percent of period duration in which the inventory level is positive. A numerical example is presented to show the applicability of proposed inventory model. The results show that Case I has the lowest holding and shortage cost, so the total benefit is higher than the other two cases.
Accepté le :
Première publication :
Publié le :
DOI : 10.1051/ro/2018099
Mots-clés : EOQ inventory model, partial backordering, imperfect items
@article{RO_2020__54_2_413_0, author = {Taleizadeh, Ata Allah and Khanbaglo, Mahboobeh Perak Sari and C\'ardenas-Barr\'on, Leopoldo Eduardo}, title = {Replenishment of imperfect items in an {EOQ} inventory model with partial backordering}, journal = {RAIRO - Operations Research - Recherche Op\'erationnelle}, pages = {413--434}, publisher = {EDP-Sciences}, volume = {54}, number = {2}, year = {2020}, doi = {10.1051/ro/2018099}, mrnumber = {4069299}, zbl = {1437.90019}, language = {en}, url = {http://www.numdam.org/articles/10.1051/ro/2018099/} }
TY - JOUR AU - Taleizadeh, Ata Allah AU - Khanbaglo, Mahboobeh Perak Sari AU - Cárdenas-Barrón, Leopoldo Eduardo TI - Replenishment of imperfect items in an EOQ inventory model with partial backordering JO - RAIRO - Operations Research - Recherche Opérationnelle PY - 2020 SP - 413 EP - 434 VL - 54 IS - 2 PB - EDP-Sciences UR - http://www.numdam.org/articles/10.1051/ro/2018099/ DO - 10.1051/ro/2018099 LA - en ID - RO_2020__54_2_413_0 ER -
%0 Journal Article %A Taleizadeh, Ata Allah %A Khanbaglo, Mahboobeh Perak Sari %A Cárdenas-Barrón, Leopoldo Eduardo %T Replenishment of imperfect items in an EOQ inventory model with partial backordering %J RAIRO - Operations Research - Recherche Opérationnelle %D 2020 %P 413-434 %V 54 %N 2 %I EDP-Sciences %U http://www.numdam.org/articles/10.1051/ro/2018099/ %R 10.1051/ro/2018099 %G en %F RO_2020__54_2_413_0
Taleizadeh, Ata Allah; Khanbaglo, Mahboobeh Perak Sari; Cárdenas-Barrón, Leopoldo Eduardo. Replenishment of imperfect items in an EOQ inventory model with partial backordering. RAIRO - Operations Research - Recherche Opérationnelle, Tome 54 (2020) no. 2, pp. 413-434. doi : 10.1051/ro/2018099. http://www.numdam.org/articles/10.1051/ro/2018099/
[1] Observation on: “Economic production quantity model for items with imperfect quality” [Int. J. Prod. Econ. 64 (2000) 59–64], Int. J. Prod. Econ. 67 (2000) 201. | DOI
,[2] Exact closed-form solutions for “optimal inventory model for items with imperfect quality and shortage backordering”, Omega 38 (2010) 233–237. | DOI
and ,[3] An economic order quantity model with defective items and shortages. Int. J. Prod. Econ. 106 (2007) 544–549. | DOI
and ,[4] Note on: economic production quantity model for items with imperfect quality – a practical approach. Int. J. Prod. Econ. 77 (2002) 85–87. | DOI
and ,[5] How many parts to make at once. Factory Mag. Manage. 10 (1913) 135–136 and 152.
,[6] An EOQ model with imperfect quality items, inspection errors, shortage backordering, and sales returns. Int. J. Prod. Econ. 143 (2013) 162–170. | DOI
and ,[7] Economic order quantity models for imperfect items with buy and repair options. Int. J. Prod. Econ. 155 (2014) 126–131. | DOI
, and ,[8] A review of the extensions of a modified EOQ model for imperfect quality items. Int. J. Prod. Econ. 132 (2011) 1–12. | DOI
, , and ,[9] Inventory models for imperfect quality items with shortages and learning in inspection. Appl. Math. Model. 36 (2012) 5334–5343. | DOI | MR | Zbl
, and ,[10] Fuzzy economic order quantity model with imperfect items, shortages and inspection errors. Syst. Eng. Proc. 4 (2012) 282–289. | DOI
and ,[11] Economic order quantity for items with imperfect quality: revisited. Int. J. Prod. Econ. 112 (2008) 808–815. | DOI
and ,[12] Effect of deterioration on the instantaneous replenishment model with imperfect quality items. Appl. Math. Model. 38 (2014) 5956–5966. | DOI | MR | Zbl
, and ,[13] Optimal vendor investment for reducing defect rate in a vendor-buyer integrated system with imperfect production process. Int. J. Prod. Econ. 155 (2014) 222–228. | DOI
and ,[14] Optimal production lot with imperfect production process under permissible delay in payments and complete backlogging. Int. J. Prod. Econ. 144 (2013) 610–617. | DOI
and ,[15] Economic ordering quantity models for items with imperfect quality. Int. J. Prod. Econ. 100 (2006) 148–154. | DOI
and ,[16] Joint replenishment with imperfect items and price discount. Comput. Ind. Eng. 74 (2014) 179–185. | DOI
, and ,[17] The deterministic EOQ with partial backordering: a new approach. Eur. J. Oper. Res. 194 (2009) 102–113. | DOI | MR | Zbl
and ,[18] Optimal lot sizing, process quality improvement and setup cost reduction. Oper. Res. 34 (1986) 137–144. | DOI | Zbl
,[19] Optimizing inventory and sales decisions in a two-stage supply chain with imperfect production and backorders. Comput. Ind. Eng. 74 (2014) 219–227. | DOI
, and ,[20] Economic order quantity model with backorder for imperfect quality items. In: >Proceedings of IEEE International Engineering Management Conference. September 11–13, St. John’s, Newfoundland, Canada (2005) 466–470. https://doi.org/10.1109/IEMC.2005.1559191.
,[21] Economic order quantity and purchasing price for items with imperfect quality when inspection shifts from buyer to supplier. Int. J. Prod. Econ. 137 (2012) 11–18. | DOI
and ,[22] Economic production cycles with imperfect production processes. IIE Trans. 18 (1986) 48–55. | DOI
and ,[23] An economic order quantity model of imperfect quality items with partial backlogging. Int. J. Syst. Sci. 42 (2011) 1409–1419. | DOI | MR | Zbl
, and ,[24] Economic production quantity model for items with imperfect quality. Int. J. Prod. Econ. 64 (2000) 59–64. | DOI
and ,[25] An EOQ model with delay in payments and stock dependent demand in the presence of imperfect production. Appl. Math. Comput. 218 (2012) 8295–8308. | MR | Zbl
,[26] An EOQ model with backorders and rejection of defective supply batches. Int. J. Prod. Econ. 155 (2014) 148–154. | DOI
, , and ,[27] Revisiting a fuzzy rough economic order quantity model for deteriorating items considering quantity discount and prepayment. Math. Comput. Model. 57 (2013) 1466–1479. | DOI | MR
, and ,[28] An EOQ inventory model with partial backordering and reparation of imperfect products. Int. J. Prod. Econ. 182 (2016) 418–434. | DOI
, and ,[29] Outsourcing rework of imperfect items in the economic production quantity (EPQ) inventory model with backordered demand. IEEE Trans. Syst. Man Cybern. Syst. 99 (2017) 1–12.
, and ,[30] EOQ models for a coordinated two-level international supply chain considering imperfect items and environmental impact. Int. J. Prod. Econ. 134 (2011) 151–158. | DOI
, and ,[31] Optimal inventory model for items with imperfect quality and shortage backordering. Omega 35 (2007) 7–11. | DOI
, and ,[32] An integrated production-inventory model for deteriorating items with imperfect quality and shortage backordering considerations. ICCSA 2006: Computational Science and Its Applications – ICCSA 2006. Lecture Notes in Computer Science, LNCS (3982) (2006) 885–897. | Zbl
, and ,[33] Optimal ordering policy for a deteriorating item with imperfect quality and partial backordering. J. Chin. Inst. Ind. Eng. 22 (2005) 509–520.
, and ,Cité par Sources :