This paper develops a sustainable integrated inventory model for maximizing profit with a controllable lead time, discrete setup cost reduction, and consideration of environmental issues. Contrary to the available literature, this paper considers a discrete setup cost for the vendor, thus making the integrated model sustainable. The customer’s demand is assumed to be selling-price dependent to increase the number of sales, and the lead time demand follows a Poisson distribution. The integrated model is used to optimized the total shipment number, volume of shipments, safety factor, investments, selling-price, and probability of moving between the “in-control” to “out-of-control” states. An algorithm is developed to obtain the numerical results. Numerical examples and sensitivity analyses are given to illustrate the model.
Accepté le :
DOI : 10.1051/ro/2018009
Mots-clés : Discrete setup cost reduction, Poisson distributed leadtime, variable safety factor, selling-price-dependent demand, shortage
@article{RO_2019__53_1_39_0, author = {Dey, Bikash Koli and Sarkar, Biswajit and Sarkar, Mitali and Pareek, Sarla}, title = {An integrated inventory model involving discrete setup cost reduction, variable safety factor, selling price dependent demand, and investment}, journal = {RAIRO - Operations Research - Recherche Op\'erationnelle}, pages = {39--57}, publisher = {EDP-Sciences}, volume = {53}, number = {1}, year = {2019}, doi = {10.1051/ro/2018009}, zbl = {1414.90037}, language = {en}, url = {http://www.numdam.org/articles/10.1051/ro/2018009/} }
TY - JOUR AU - Dey, Bikash Koli AU - Sarkar, Biswajit AU - Sarkar, Mitali AU - Pareek, Sarla TI - An integrated inventory model involving discrete setup cost reduction, variable safety factor, selling price dependent demand, and investment JO - RAIRO - Operations Research - Recherche Opérationnelle PY - 2019 SP - 39 EP - 57 VL - 53 IS - 1 PB - EDP-Sciences UR - http://www.numdam.org/articles/10.1051/ro/2018009/ DO - 10.1051/ro/2018009 LA - en ID - RO_2019__53_1_39_0 ER -
%0 Journal Article %A Dey, Bikash Koli %A Sarkar, Biswajit %A Sarkar, Mitali %A Pareek, Sarla %T An integrated inventory model involving discrete setup cost reduction, variable safety factor, selling price dependent demand, and investment %J RAIRO - Operations Research - Recherche Opérationnelle %D 2019 %P 39-57 %V 53 %N 1 %I EDP-Sciences %U http://www.numdam.org/articles/10.1051/ro/2018009/ %R 10.1051/ro/2018009 %G en %F RO_2019__53_1_39_0
Dey, Bikash Koli; Sarkar, Biswajit; Sarkar, Mitali; Pareek, Sarla. An integrated inventory model involving discrete setup cost reduction, variable safety factor, selling price dependent demand, and investment. RAIRO - Operations Research - Recherche Opérationnelle, Tome 53 (2019) no. 1, pp. 39-57. doi : 10.1051/ro/2018009. http://www.numdam.org/articles/10.1051/ro/2018009/
[1] A joint approach for setting unit price and the length of the credit period for a seller when end demand is price sensitive. Int. J. Prod. Econ. 83 (2003) 115–122. | DOI
and ,[2] Reducing lost-sales rate in (T, R, L) inventory model with controllable lead time. Appl. Math. Mod. 34 (2010) 3465–3477. | DOI | Zbl
and ,[3] Integrated simulation modeling of business, maintenance and production systems for concurrent improvement of lead time, cost and production rate. Ind. Eng. Manag. Syst. 15 (2017) 403–431.
and ,[4] Periodic review lost-sales inventory models with compound poisson demand and constant lead times of any length. Eur. J. Oper. Res. 220 (2012) 106–114. | DOI | Zbl
and ,[5] An integrated production inventory model with raw material replenishment considerations in a three layer supply chain. Int. J. Prod. Econ. 143 (2013) 53–61. | DOI
, and ,[6] The derivation of EOQ/EPQ inventory models with two backorders costs using analytic geometry and algebra. Appl. Math. Mod. 35 (2011) 2394–2407. | DOI | Zbl
,[7] On the inventory model with continuous and discrete lead time, backorders and lost sales. Appl. Math. Mod. 33 (2009) 2196–2206. | DOI | Zbl
and ,[8] Stochastic programming for the optimization of transportation-inventory strategy. Ind. Eng. Manag. Syst. 16 (2017) 44–51.
and ,[9] A joint economic-lot-size model for purchaser and vendor: a comment. Decis. Sci. 19 (1988) 236–241. | DOI
,[10] Implementation of JIT purchasing: an integrated approach. Prod. Plann. Cont. 8 (1997) 152–157. | DOI
and ,[11] An integrated inventory model involving manufacturing setup cost reduction in compound poisson process. Int. J. Prod. Res. 49 (2011) 1219–1228. | DOI | Zbl
, , and ,[12] Optimal and approximatem(Q, r) inventorypolicies with lost sales and gamma-distributed lead time. Int. J. Prod. Econ. 30 (1993) 179–194. | DOI
and ,[13] An EOQ model with price and time dependent demand under the influence of complement and substitute product’s selling-prices. J. Alanya Fac. Bus./Alanya Isletme Fakültesi Dergisi 3 (2011) 21–32.
, and ,[14] Multi-stage cleaner production process with quality improvement and lead time dependent ordering cost. J. Clean. Prod. 144 (2017) 572–590. | DOI
and ,[15] Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process. Comput. Oper. Res. 29 (2002) 1701–1717. | DOI | Zbl
, and ,[16] Price-sensitive imperfect production inventory model with exponential partial backlogging. To appear in: Int. J. Syst. Sci. Oper. Logist. (2017). DOI: | DOI
and ,[17] Multi-item EOQ model while demand is sales price and price break sensitive. Econ. Model. 29 (2012) 2283–2288. | DOI
, and ,[18] Joint pricing and ordering policy for two-echelon imperfect production inventory model with two cycles. Int. J. Prod. Econ. 155 (2014), 229–238. | DOI
, and ,[19] Two-echelon manufacturer–retailer supply chain strategies with price, quality, and promotional effort sensitive demand. Int. Trans. Oper. Res. 22 (2015), 1071–1095. | DOI | Zbl
, and ,[20] Coordination contracts for competitive two-echelon supply chain with price and promotional effort sensitive non-linear demand. Int. J. Syst. Sci. Oper. Logist. 2 (2015) 113–124.
, , ,[21] Two-echelon competitive integrated supply chain model with price and credit period dependent demand. Int. J. Syst. Sci. 47 (2016) 995–1007. | DOI | Zbl
, and ,[22] Coordinated pricing and inventory control with batch production and Erlang lead times. Prob. Eng. Inf. Sci. 28 (2014) 529–563. | DOI | Zbl
and ,[23] Optimal lot sizing, process quality improvement and setup cost reduction. Oper. Res. 34 (1986) 137–144. | DOI | Zbl
,[24] Price-sensitive demand for perishable items – an EOQ model. Appl. Math. Mod. 217 (2011) 6248–6259. | Zbl
,[25] A production-inventory model with probabilistic deterioration in two-echelon supply chain management. Appl. Math. Mod. 37 (2013) 3138–3151. | DOI | Zbl
,[26] Supply chain coordination with variable backorder, inspections, and discount policy for fixed lifetime products. Math. Prob. Eng. 2016 (2016) 6318737. | Zbl
,[27] Periodic review fuzzy inventory model with variable lead time and fuzzy demand. Int. Trans. Oper. Res. 24 (2017) 1197–1227. | Zbl
and ,[28] Integrated vendor–buyer supply chain model with vendor’s setup cost reduction. Appl. Math. Comput. 224 (2013) 362–371. | Zbl
and ,[29] Improved quality, setup cost reduction, and variable backorder costs in an imperfect production process. Int. J. Prod. Econ. 155 (2014) 204–213. | DOI
and ,[30] Variable deterioration and demand – an inventory model. Econ. Mod. 31 (2013) 548–556. | DOI
and ,[31] An inventory model with finite replenishment rate, trade credit policy and price-discount offer. J. Ind. Eng. 2013 (2013) 672504.
, and ,[32] An economic production quantity model with random defective rate, rework process and backorders for a single stage production system. J. Manuf. Syst. 33 (2014) 423–435. | DOI
, , and ,[33] An EMQ model with price and time dependent demand under the effect of reliability and inflation. Appl. Math. Comput. 231 (2014) 414–421. | Zbl
, and ,[34] Manufacturing setup cost reduction and quality improvement for the distribution free continuous-review inventory model with a service level constraint. J. Manuf. Syst. 34 (2015) 74–82. | DOI
, and ,[35] Effect of unequal lot sizes, variable setup cost, and carbon emission cost in a supply chain model. Math. Prob. Eng. 2015 (2015) 469486. | Zbl
, , and ,[36] Effect of variable transportation and carbon emission in a three-echelon supply chain model. Trans. Res. E: Logist. Transp. Rev. 91 (2016) 112–128. | DOI
, , and ,[37] Two-echelon supply chain model with manufacturing quality improvement and setup cost reduction. J. Ind. Manag. Opt. 13 (2017) 1085–1104. | DOI | Zbl
, , , and ,[38] An integrated economic lot-size model for vendor–buyer inventory system when input is random. Math. Comp. Mod. 49 (2009) 1326–1330. | DOI | Zbl
and ,[39] An economic order quantity model with partial backordering and a special sale price. Eur. J. Oper. Res. 221 (2012) 571–583. | DOI | Zbl
, , and ,[40] An alternative EPQ model with rework process at a single-stage manufacturing system with planned backorders. Comput. Ind. Eng. 64 (2013) 748–755. | DOI
, and ,[41] A single-vendor and multiple-buyers production–inventory policy for a deteriorating item. Eur. J. Oper. Res. 143 (2002) 570–581. | DOI | Zbl
and ,[42] Deterministic EOQ with partial backordering and correlated demand caused by cross-selling. Eur. J. Oper. Res. 210 (2011) 537–551. | DOI | Zbl
, and ,Cité par Sources :