Production planning in data envelopment analysis without explicit inputs
RAIRO - Operations Research - Recherche Opérationnelle, Tome 47 (2013) no. 3, pp. 273-284.

In the performance measurement using tools such as data envelopment analysis (DEA), data without explicit inputs has attracted considerable attention among researchers. In such studies the problem of production planning in the next production season is an important and interesting subject. Because of the uncertain nature of the future, decision makers need to provide robust procedures in order to examine alternative courses of action and their implications. The purpose of this paper is to develop an approach to production planning problem in production processes without explicit inputs that typically appears in centralized decision making environment. Application of the proposed approach is illustrated empirically using a real case.

DOI : 10.1051/ro/2013038
Classification : 90B30
Mots-clés : data envelopment analysis, production planning, efficiency, output
@article{RO_2013__47_3_273_0,
     author = {Amirteimoori, Alireza and Daneshian, Behrooz and Kordrostami, Sohrab and Shahroodi, Kambiz},
     title = {Production planning in data envelopment analysis without explicit inputs},
     journal = {RAIRO - Operations Research - Recherche Op\'erationnelle},
     pages = {273--284},
     publisher = {EDP-Sciences},
     volume = {47},
     number = {3},
     year = {2013},
     doi = {10.1051/ro/2013038},
     mrnumber = {3143752},
     zbl = {1282.90060},
     language = {en},
     url = {http://www.numdam.org/articles/10.1051/ro/2013038/}
}
TY  - JOUR
AU  - Amirteimoori, Alireza
AU  - Daneshian, Behrooz
AU  - Kordrostami, Sohrab
AU  - Shahroodi, Kambiz
TI  - Production planning in data envelopment analysis without explicit inputs
JO  - RAIRO - Operations Research - Recherche Opérationnelle
PY  - 2013
SP  - 273
EP  - 284
VL  - 47
IS  - 3
PB  - EDP-Sciences
UR  - http://www.numdam.org/articles/10.1051/ro/2013038/
DO  - 10.1051/ro/2013038
LA  - en
ID  - RO_2013__47_3_273_0
ER  - 
%0 Journal Article
%A Amirteimoori, Alireza
%A Daneshian, Behrooz
%A Kordrostami, Sohrab
%A Shahroodi, Kambiz
%T Production planning in data envelopment analysis without explicit inputs
%J RAIRO - Operations Research - Recherche Opérationnelle
%D 2013
%P 273-284
%V 47
%N 3
%I EDP-Sciences
%U http://www.numdam.org/articles/10.1051/ro/2013038/
%R 10.1051/ro/2013038
%G en
%F RO_2013__47_3_273_0
Amirteimoori, Alireza; Daneshian, Behrooz; Kordrostami, Sohrab; Shahroodi, Kambiz. Production planning in data envelopment analysis without explicit inputs. RAIRO - Operations Research - Recherche Opérationnelle, Tome 47 (2013) no. 3, pp. 273-284. doi : 10.1051/ro/2013038. http://www.numdam.org/articles/10.1051/ro/2013038/

[1] A. Amirteimoori and A. Emrouznejad, Flexible measures in production process: A DEA-based approach. RAIRO-Oper. Res. 45 (2011) 63-74. | Numdam | Zbl

[2] A. Amirteimoori and S. Kordrostami, Production planning: a DEA-based approach. Int. J. Adv. Manuf. Techn. 56 (2011) 369-376.

[3] A.D. Athanassopoulos, N. Lambroukos and L.M. Seiford, Data envelopment analysis for setting targets to electricity generating plants. Eur. J. Oper. Res. 115 (1999) 413-428.

[4] R.D. Banker, A. Charens and W.W. Cooper, Some models for estimating technical and scale inefficiencies in Data Envelopment Analysis. Manag. Sci. 30 (1984) 1078-1092. | Zbl

[5] J.E. Beasely, Allocating fixed costs and resources via DEA. Eur. J. Oper. Res. 147 (2003) 198-216. | Zbl

[6] A. Charnes, W.W. Cooper and E. Rhodes, Measuring the efficiency of decision making units. Eur. J. Oper. Res. 2 (1978) 429-444. | MR | Zbl

[7] J. Du, L. Liang, Y. Chen and G. Bi, DEA-based production planning. OMEGA 38 (2010) 105-112.

[8] W.W. Cooper, L.M. Seiford and K. Tone, Introduction to data envelopment analysis and its uses. Springer Publisher (2006). | Zbl

[9] A. Emrouznejad, G. Tavares and B. Parker, Evaluation of research in efficiency and productivity: A survey and analysis of the first 30 years of scholarly literature in DEA. Socio Econ. Plan. Sci. 42 (2008) 151-157.

[10] L. Feng, A generalized DEA model for centralized resource allocation. Eur. J. Oper. Res. 228 (2013) 405-412. | MR

[11] B. Golany, An interactive MOLP procedure for the extension of DEA to effectiveness analysis. J. Oper. Res. Soc. 39 (1988) 725-734. | Zbl

[12] B. Kim and S. Kim, Extended model for a hybrid production planning approach. Int. J. Prod. Econ. 73 (2001) 165-173.

[13] P. Korhonen and M. Syrjanen, Resource allocation based on efficiency analysis. Management Sci. 50 (2004) 1134-1144. | Zbl

[14] W.B. Liu, D.Q. Zhang, W. Meng, X.X. Li and F. Xu, A study of DEA models without explicit inputs. OMEGA 39 (2011) 472-480.

[15] K.A. Lovell and J. Pastor, Radial DEA models without inputs or outputs. Eur. J. Oper. Res. 118 (1999) 45-51. | Zbl

[16] S. Lozano and G. Villa, Centralized Resource Allocation Using Data Envelopment Analysis. J. Prod. Anal. 22 (2004) 143-161.

[17] A. Varmaz, A. Varwig and T. Podig, Centralized resource planning and Yardstick competition. Omega 41 (2013) 112-118.

Cité par Sources :